Eletrical Technician
Education
1997 – 2001 : SMK Negeri 1 Cimahi Department of Refrigeration &Air Conditioning
1994 – 1997 : SLTP Negeri 3 Cimahi
1988 – 1994 : SD Negeri Pasar Atas Cimahi
Trainings
Tech View Trane Water Chiller by PT. BIA, April 2012
Supervisory Development Program by The Trans Luxury Hotel, July 2013 until May 2014
HSE training by PETROTEKNO, September 2, 2015
Sea Survival training by Barcoindo, September 4, 2015
Swagelok installation training by Swagelok Indonesia, September 8, 2015
NUI HSE induction by BP LNG Tangguh, March 22, 2016
Performing Authority by BP, September 19-20, 2016
Isolation Authority Electrical Person by BP, November 9, 2016
eCoW by BP, November until December 2016
SAP PM 1.3 by BP, June 2017
Tan Delta “Omicron” CPC 100 by PT. Citra Wahana Sekar Buana, January 8-10, 2018
Teknisi K3 Listrik by Adhikarya Kualita Utama, January 24-27, 2018
Trofical BOSIET & Travel Safely by Boat by Samson Tiara, July 16-18, 2018
WAH ( Fall Protection & Basic High Angle Rescue) by Samson Tiara, November 5-8, 2018
Basic Infra Red Thermography Analysis by Daun Biru April 10-12, 2019
Condition Monitoring Advance Vibration Analysis and Oil Management by Daun Biru Engineering, August 26-28, 2019
Helideck Assistant by PT. Avtran Conres Serindo, November 27-29, 2019
Authorized Gas Tester Level 1&2 by Petrotekno November 30-December 1, 2021
T-Foet by PT Lautan Tenang Jaya, April 14, 2022
Advanced Fire Fighting by HSE Training Centre PT Pertamina, October 4-6, 2022
Experience
•» Electrical Technician Premier Oil Indonesia/ Harbour Energy July 13, 2018- 13 September 2023 at Anoa AGX Natuna Sea.
Job Description :
Preventive, Predictive, Corrective and Breakdown maintenance Gas Turbin Generator, Diesel Generator, CCVT, Switchgear, UPS, Battery charger, Air Compressor, Nav aids, Fog Horn, Anti fouling protection, Pedestal crane, HVAC, Motor Pump, Motor Fin Fan Cooler, Kitchen & Laundry equipment etc.
•» NUI and Harbor Marine Electrical Foreman Kso Elnusa-Waskita February 1, 2017 – July 22, 2018 at BP Tangguh LNG Teluk Bintuni West Papua.
Job description :
Preventive, Predictive, Corrective and Breakdown maintenance Switchgear HV & LV, Transformer, EDG, Arrester, HPU WHCP, Methanol Pump, Air Compressor, Battery Charger, Receptacle, Fog Horn, Nav Aid, Quick Release Hook, Cathodic Protection, Lightning Protection, Emergency Lighting etc.
HVAC system Compressor, Package Unit, Split Duct, Intake Fan, Barometric Damper, Motorize Damper, Pressure Differential Switch, Duct heater etc.
Read, understand electrical drawing and data sheet.
•» Electrical Workshop & HVAC Technician PT. Indokomas Buana Perkasa ( Cegelec ) September 1, 2015 – January 30, 2017 at BP Tangguh LNG Teluk Bintuni West Papua.
Job description :
Repair & Test Motor, Primary and Secondary Inject Current Test. Preventive, Predictive, Corrective and Breakdown maintenance HVAC system DDC HVAC control system, Air Handling Unit, Air Condensing Unit, Split Duct, Intake Fan, Exhaust Fan, Blast Damper, Motorize damper, Duct heater etc.
•» HVAC and Refrigeration Supervisor The Trans Luxury Hotel Bandung, 5 Star Hotel, September 6, 2012 - September 7, 2015.
Job description :
Operation, repair and maintenance centrifugal water chiller Trane CVHE 480 TRand Heat Pump RTWD 120 TR.
Repair and maintenance Freezer, Chiller, AHU, FCU and VRF, Pumps, Brand aroma, Building Automation System andCooling Tower.
•» Senior Chiller Technician PT. Bukaka Inti AirconJakarta, March 1, 2012 - August 1, 2012
Job description :
Repair and maintenance Trane Water Chiller (CVHE, CVHG, RTAC, RTAD& RTHD) McQuay (WSC, WDC& PEH) Carrier(30 GT, 30GB, 30 HK & 19 XR) York (YEAJ, YCAZ& YK). HVAC system at Carrefour west area, Lippo Group, Novotel, JW Marriott Medan, Pullman Hotel, Hotel Indonesia Kempinsky, mini chiller at HM Sampoerna and etc.
•» Water Chiller and Transporter Technician Festival City Link PT. Sakti Kelola Persada ( Agung Podomoro ) Bandung, September 6, 2010 - March 14, 2012
Job description :Repair, maintenance and operation Screw water Chiller Mc Quay PES 800 TR .
Repair and maintenance unit AHU, FCU and AC Split and CoolingTower.
Routine regeneration of water softener system for Cooling Tower.
Perform maintenance and rectify Escalator and ElevatorOtis & Pillar.
•» Chiller Technician PT. Waskita Prima Guna Jakarta, March 1, to July 15, 2010.
Job description :
Installation, Commissioning, Repair and Maintenance water chiller Dunhambush 90-600 TR at Tanah Abang Block A, Seasons City, Unilever, Wisma Bakrie, Pasar Pagi Mall and etc.
Overhaul semi and full hermetic screw compressor.
•» Refrigeration Technician Revolving Team Department PT. Carrefour Indonesia. Bandungand East Jakarta, January 2, 2009 - February 28, 2010.
Job description :
Repair and maintenance refrigeration systems4 stores area Bandung and 7 stores in East Jakarta –and Bekasi. Covers multi racksystem, freezer room, chiller room, icemaker , up rightchiller, fulverizer and under counter.
Repair and maintenance HVAC systems, Trane and York centrifugal water chiller, AHU, FCU, Split, Packaged type and cooling tower.
•» HVAC Technician PT. CERES Bandung, September 16, 2002 - January 10, 2009.
Job description :
Repair and maintenance HVAC systems screw water chillerTrane, Hitachi, York, Dunhambush, Carrier and Aicool. Repair and maintenance AHU, Cassette, Ceiling, Wallmounted and standing floor type.
Repair and maintenance refrigerationsystems Cooling Box, Cooling Tunnel, Tempering and Dehumidifier.
•» AC Technician PT. MitraSurya Perkasa Balikpapan in East Kalimantan 2001-2002.
Job description :
Installation, commissioning, repair and maintenance air conditioning split wall mounted, standing floor, and central type.
I created this life history in truth.
Yours faithfully,
Carli Hamdani